アマイゼ ジャングハインリッヒ ERC 214 ハンドリフトJungheinrich
Ameise Jungheinrich ERC 214
アマイゼ ジャングハインリッヒ ERC 214 ハンドリフト
Jungheinrich
Ameise Jungheinrich ERC 214
VB 消費税別
€1,100
製造年
2006
状態
中古
所在地
Sinntal 

写真は示しています
地図を表示
機械に関するデータ
価格と所在地
VB 消費税別
€1,100
- 所在地:
- Sinntal, ドイツ

技術詳細
- 積載能力:
- 1,400 kg(キログラム)
- バッテリー電圧:
- 24 V
- バッテリー重量:
- 274 kg(キログラム)
オファーの詳細
- 広告ID:
- A21731193
- 更新:
- 最終更新日:16.04.2026
説明
Ameise Jungheinrich ERC 214
The pallet truck is currently not operational:
Drive switch defective, new battery required
General terms and conditions for the offer:
- 100% payment in advance, net without deduction, before dismantling begins and upon receipt of invoice.
- The equipment remains our property until full payment has been received.
- The purchaser may withdraw from the purchase agreement at any time in writing and without stating reasons until full payment has been made.
- Ex stock location, the buyer is responsible for organizing dismantling, loading, and transport of the equipment at their own expense.
- The buyer is responsible for proper dismantling and commissioning.
- The buyer undertakes to contract only qualified specialists for dismantling.
- Dates must be coordinated with KT and adapted to the plant’s operating hours.
- Dismantling must be completed entirely up to the supply lines.
Lodpfx Akjy Dg N Hs Djhf
- All site safety regulations must be observed.
- The equipment is sold as inspected and in its current condition, without any guarantee or warranty for material or cosmetic defects.
この広告は自動翻訳されています。翻訳ミスがある可能性があります。
The pallet truck is currently not operational:
Drive switch defective, new battery required
General terms and conditions for the offer:
- 100% payment in advance, net without deduction, before dismantling begins and upon receipt of invoice.
- The equipment remains our property until full payment has been received.
- The purchaser may withdraw from the purchase agreement at any time in writing and without stating reasons until full payment has been made.
- Ex stock location, the buyer is responsible for organizing dismantling, loading, and transport of the equipment at their own expense.
- The buyer is responsible for proper dismantling and commissioning.
- The buyer undertakes to contract only qualified specialists for dismantling.
- Dates must be coordinated with KT and adapted to the plant’s operating hours.
- Dismantling must be completed entirely up to the supply lines.
Lodpfx Akjy Dg N Hs Djhf
- All site safety regulations must be observed.
- The equipment is sold as inspected and in its current condition, without any guarantee or warranty for material or cosmetic defects.
この広告は自動翻訳されています。翻訳ミスがある可能性があります。
提供者
プロの販売業者
登録日: 2020
16 オンライン広告
お問い合わせを送信
あなたの掲載は正常に削除されました
エラーが発生しました












