作業用プラットフォーム付きセミトレーラーES-GE
3-Achs-Ballastauflieger
作業用プラットフォーム付きセミトレーラー
ES-GE
3-Achs-Ballastauflieger
状態
新しい
所在地
Essen 

写真は示しています
地図を表示
機械に関するデータ
価格と所在地
- 販売者所在地:
- Heegstraße 6-8, 45356 Essen, ドイツ

電話する
技術詳細
- 最大積載重量:
- 39,850 kg(キログラム)
- 総重量:
- 45,000 kg(キログラム)
- アクスル構成:
- 3軸
- 全幅:
- 2,540 mm
- 装備:
- ABS(アンチロック・ブレーキ・システム)
オファーの詳細
- 広告ID:
- A19520556
- リファレンス番号:
- 36633
- 更新:
- 最終更新日:29.08.2025
説明
You can find our complete vehicle inventory, including immediately and short-term available vehicles, on our website.
Excerpt from the specifications. Full equipment details available upon request.
Chassis:
- Welded construction from high-quality steel sections with through-profile cross members
- Designed for high point loads. Outer frame as UNP profile
- Fifth wheel plate approx. 8 mm, underride guard nose approx. 700 mm wide
- Bracket at front for customer-side mounting of a support device, approx. 90 x 90 x 4 mm
Coupling device:
- 2-inch kingpin (mount also suitable for 3.5)
Rear underrun protection:
- According to EC, bolted design
Side underrun protection:
- According to EC
Landing gear:
- 24 t landing legs with single-side operation (test load approx. 66 t), Jost Modul CH (Heavy Duty) S-foot
Axles:
- 3 x 9 t air suspension axle units, manufacturer of our choice, with disc brake approx. 430 x 45 mm
- ABS
- Hub-centric wheel mounting, 10-hole, ET 120
- Total air suspension travel approx. 200 mm, of which raising approx. 140 mm and lowering approx. 60 mm, controlled via rotary slide valve with detent, with RTR function
- Switch for second ride height (+ approx. 50 mm) on the bracket of the lifting and lowering device
- Smartboard/TIM/Infocenter, without TPMS display
Lifting axle:
- First axle liftable, with fully automatic load-dependent lift control, starting aid via button in the driver’s cab (15-pin socket PIN12). Button in cab not included in delivery
Braking system:
Manufacturer of our choice
- Two-line compressed-air braking system according to EC with EBS and RSS, automatic load-dependent adjustment
- Spring brake cylinder as parking brake
- Mistake-proof coupling heads mounted securely on front cross member, without connecting line to the motor vehicle
Tyres:
- 6 units, 385/65 R22.5 160J on 11.75 x 22.5 rims (manufacturer of our choice), ET 120
- Basic version tyre pressure monitoring, connected to EBS CAN-bus system
- Tyre pressure display in driver’s cab (pre-installed by truck manufacturer)
Mudguards:
- According to EC, PVC mudguards (half-shells) over all axles
- Anti-spray mudflaps
Load securing:
- 8 pairs of lashing plates welded into the outer frame (pulling force approx. 3 t)
- 6 pairs of lashing rings on the side of the outer frame, evenly distributed (pulling force approx. 10 t)
- 13 pairs of lashing eyes (bails) on the outer frame (tested lashing capacity approx. 2.5 t per point)
Stake pockets/stakes:
- 5 pairs of stake pockets recessed in the outer frame, approx. 90 x 90 x 4 mm
- 3 pairs of stake pockets recessed in the loading floor, approx. 90 x 90 x 4 mm
- 10 plug-in stakes made of galvanized box section, approx. 80 x 80 x 4 mm, with stop at the bottom
Front wall:
- Bolted front wall, approx. 1,200 mm high, covered with approx. 5.5 m sheet metal
Stake magazine:
- Inside the front wall, a magazine for plug-in stakes
Floor:
- Approx. 28 mm hardwood floor recessed in the outer frame, with galvanized omega steel profiles
Lighting system:
- According to EC, 24 volts with multi-chamber taillights
- LED side marker lights
- LED front position lights white
- LED rear outline marker lights
- Number plate lights
- 1x 15-pin and 2x 7-pin socket connectors on the front cross member
Equipment:
- Chock with double holder
- Warning sign according to ECE 70
- 2 LED work lights on the lamp bracket (switched by reverse gear)
Dkjdewx Dbpspfx Ag Ael
- Bracket for optional rotating beacon at rear (incl. beacon)
- 1 foldable and extend
この広告は自動翻訳されています。翻訳ミスがある可能性があります。
Excerpt from the specifications. Full equipment details available upon request.
Chassis:
- Welded construction from high-quality steel sections with through-profile cross members
- Designed for high point loads. Outer frame as UNP profile
- Fifth wheel plate approx. 8 mm, underride guard nose approx. 700 mm wide
- Bracket at front for customer-side mounting of a support device, approx. 90 x 90 x 4 mm
Coupling device:
- 2-inch kingpin (mount also suitable for 3.5)
Rear underrun protection:
- According to EC, bolted design
Side underrun protection:
- According to EC
Landing gear:
- 24 t landing legs with single-side operation (test load approx. 66 t), Jost Modul CH (Heavy Duty) S-foot
Axles:
- 3 x 9 t air suspension axle units, manufacturer of our choice, with disc brake approx. 430 x 45 mm
- ABS
- Hub-centric wheel mounting, 10-hole, ET 120
- Total air suspension travel approx. 200 mm, of which raising approx. 140 mm and lowering approx. 60 mm, controlled via rotary slide valve with detent, with RTR function
- Switch for second ride height (+ approx. 50 mm) on the bracket of the lifting and lowering device
- Smartboard/TIM/Infocenter, without TPMS display
Lifting axle:
- First axle liftable, with fully automatic load-dependent lift control, starting aid via button in the driver’s cab (15-pin socket PIN12). Button in cab not included in delivery
Braking system:
Manufacturer of our choice
- Two-line compressed-air braking system according to EC with EBS and RSS, automatic load-dependent adjustment
- Spring brake cylinder as parking brake
- Mistake-proof coupling heads mounted securely on front cross member, without connecting line to the motor vehicle
Tyres:
- 6 units, 385/65 R22.5 160J on 11.75 x 22.5 rims (manufacturer of our choice), ET 120
- Basic version tyre pressure monitoring, connected to EBS CAN-bus system
- Tyre pressure display in driver’s cab (pre-installed by truck manufacturer)
Mudguards:
- According to EC, PVC mudguards (half-shells) over all axles
- Anti-spray mudflaps
Load securing:
- 8 pairs of lashing plates welded into the outer frame (pulling force approx. 3 t)
- 6 pairs of lashing rings on the side of the outer frame, evenly distributed (pulling force approx. 10 t)
- 13 pairs of lashing eyes (bails) on the outer frame (tested lashing capacity approx. 2.5 t per point)
Stake pockets/stakes:
- 5 pairs of stake pockets recessed in the outer frame, approx. 90 x 90 x 4 mm
- 3 pairs of stake pockets recessed in the loading floor, approx. 90 x 90 x 4 mm
- 10 plug-in stakes made of galvanized box section, approx. 80 x 80 x 4 mm, with stop at the bottom
Front wall:
- Bolted front wall, approx. 1,200 mm high, covered with approx. 5.5 m sheet metal
Stake magazine:
- Inside the front wall, a magazine for plug-in stakes
Floor:
- Approx. 28 mm hardwood floor recessed in the outer frame, with galvanized omega steel profiles
Lighting system:
- According to EC, 24 volts with multi-chamber taillights
- LED side marker lights
- LED front position lights white
- LED rear outline marker lights
- Number plate lights
- 1x 15-pin and 2x 7-pin socket connectors on the front cross member
Equipment:
- Chock with double holder
- Warning sign according to ECE 70
- 2 LED work lights on the lamp bracket (switched by reverse gear)
Dkjdewx Dbpspfx Ag Ael
- Bracket for optional rotating beacon at rear (incl. beacon)
- 1 foldable and extend
この広告は自動翻訳されています。翻訳ミスがある可能性があります。
提供者
注意: 無料で登録するかログインして、すべての情報を取得してください。
登録日: 2003
77 オンライン広告
お問い合わせを送信
電話 & ファックス
+49 201 8... 広告
これらの広告もご興味があるかもしれません。
小型広告
Essen
9,183 km
作業用プラットフォーム付きセミトレーラー
ES-GE3-Achs-Ballastauflieger
ES-GE3-Achs-Ballastauflieger
小型広告
Essen
9,183 km
トラクターヘッド
MANTGX 33.540 6x4 BL SA mit Fassi F545RA.2.26
MANTGX 33.540 6x4 BL SA mit Fassi F545RA.2.26
小型広告
Gilze
9,261 km
クレーン車
VolvoFM 480 8x2 HMF THOR CRANE - KRAN + JIB
VolvoFM 480 8x2 HMF THOR CRANE - KRAN + JIB
あなたの掲載は正常に削除されました
エラーが発生しました






























