クリーンルーム用更衣室ULKEY
クリーンルーム用更衣室
ULKEY
製造年
2017
状態
中古
所在地
Tamási 

写真は示しています
地図を表示
機械に関するデータ
価格と所在地
- 所在地:
- Tamási, 7090 Ungarn

電話する
オファーの詳細
- 広告ID:
- A21169237
- リファレンス番号:
- 8000001
- 更新:
- 最終更新日:05.02.2026
説明
Changing Room and Personal Entry Area:
Dimensions: 2000 x 2000 x 3000 mm
The changing room is divided into two zones: a gray zone and a white zone.
In the gray zone, personnel remove the footwear and gowns worn in the assembly area, sit on the bench separating the zones, and change into cleanroom footwear and gowns. Whenever personnel leave the cleanroom during operations, they must always change their attire upon re-entry.
Cleanroom:
Dimensions: 5500 x 4500 x 3000 mm
The goods-in zone is separated from the cleanroom adhesive area (1750 x 750 x 3000 mm).
Doors and windows between the goods-in zone and the cleanroom are interlocked; only one door or window can be opened at a time.
Upon entry: doors only open after a 6-minute delay, except when issuing storage devices, when no 6-minute lockout is applied.
After processing, the glued products are mechanically transferred to the assembly area via a pass-through window. Delivery windows must always be closed after the transfer process.
The cleanroom is pressurized, regulated via control dampers.
Air of ISO8 quality is supplied to the cleanroom through filters installed in the air handling unit.
Air handling units are installed on the support structure above the cleanroom ceiling.
Air cleanliness is continuously monitored and recorded.
If air cleanliness falls below acceptable levels, a visual alarm notifies personnel, or intervention in the production process occurs and doors and windows are locked.
Supply Fan:
Air volume: 8,000 m³/h
Static pressure: 400 Pa
400 V, 50 Hz, k kW
With silencer
Ventilation ductwork
HEPA filter
Frame Structure:
Powder-coated
Manufactured from cold-rolled profile materials
Side Walls, Roof Structure:
LV80 Kingspan sandwich panels
3 fixed windows, transparent and thermally insulated
2 entry doors, each with a fixed, transparent upper window
2 hatch doors, each with a fixed, transparent upper window
1 outlet opening with sliding window sash
Electrical Control:
Bwjdpsyhbczofx Ab Teh
Electrical distribution cabinet
Control cabinet
Frequency converter
Measuring instruments
Monitoring System:
Vision monitoring system
Data storage computing unit (laptop)
Changing Room Furnishings:
Gray zone:
- Shoe storage
- Coat storage
- Hanging zone
- Dividing floor
この広告は自動翻訳されています。翻訳ミスがある可能性があります。
Dimensions: 2000 x 2000 x 3000 mm
The changing room is divided into two zones: a gray zone and a white zone.
In the gray zone, personnel remove the footwear and gowns worn in the assembly area, sit on the bench separating the zones, and change into cleanroom footwear and gowns. Whenever personnel leave the cleanroom during operations, they must always change their attire upon re-entry.
Cleanroom:
Dimensions: 5500 x 4500 x 3000 mm
The goods-in zone is separated from the cleanroom adhesive area (1750 x 750 x 3000 mm).
Doors and windows between the goods-in zone and the cleanroom are interlocked; only one door or window can be opened at a time.
Upon entry: doors only open after a 6-minute delay, except when issuing storage devices, when no 6-minute lockout is applied.
After processing, the glued products are mechanically transferred to the assembly area via a pass-through window. Delivery windows must always be closed after the transfer process.
The cleanroom is pressurized, regulated via control dampers.
Air of ISO8 quality is supplied to the cleanroom through filters installed in the air handling unit.
Air handling units are installed on the support structure above the cleanroom ceiling.
Air cleanliness is continuously monitored and recorded.
If air cleanliness falls below acceptable levels, a visual alarm notifies personnel, or intervention in the production process occurs and doors and windows are locked.
Supply Fan:
Air volume: 8,000 m³/h
Static pressure: 400 Pa
400 V, 50 Hz, k kW
With silencer
Ventilation ductwork
HEPA filter
Frame Structure:
Powder-coated
Manufactured from cold-rolled profile materials
Side Walls, Roof Structure:
LV80 Kingspan sandwich panels
3 fixed windows, transparent and thermally insulated
2 entry doors, each with a fixed, transparent upper window
2 hatch doors, each with a fixed, transparent upper window
1 outlet opening with sliding window sash
Electrical Control:
Bwjdpsyhbczofx Ab Teh
Electrical distribution cabinet
Control cabinet
Frequency converter
Measuring instruments
Monitoring System:
Vision monitoring system
Data storage computing unit (laptop)
Changing Room Furnishings:
Gray zone:
- Shoe storage
- Coat storage
- Hanging zone
- Dividing floor
この広告は自動翻訳されています。翻訳ミスがある可能性があります。
あなたの掲載は正常に削除されました
エラーが発生しました









































