ペイントショップPony Luxury Coating
Pony L11000 (11x5x5)
ペイントショップ
Pony Luxury Coating
Pony L11000 (11x5x5)
固定価格 消費税別
€81,250
製造年
2025
状態
新しい
所在地
Würzburg 

写真は示しています
地図を表示
機械に関するデータ
価格と所在地
固定価格 消費税別
€81,250
- 所在地:
- Würzburg, ドイツ

技術詳細
- 全高:
- 5,600 mm
- 全長:
- 11,200 mm
- 全幅:
- 5,100 mm
- 入力電流の種類:
- 三相
- 保証期間:
- 24 ヶ月
- 内寸高さ:
- 4,970 mm
- 内寸長:
- 11,000 mm
- 温度:
- 80 °C
- 内寸幅:
- 5,000 mm
- 空気需要:
- 52,000 m³/時
- 入力電圧:
- 380 V
- 暖房能力:
- 250 キロワット (339.91 馬力)
- 出力:
- 45 キロワット (61.18 馬力)
- 燃料:
- 液化石油ガス(LPG)
- 入力周波数:
- 50 ヘルツ
- エネルギー消費量:
- 45 キロワット時
- 断熱材厚さ:
- 50 mm
- 定格出力:
- 250 キロワット (339.91 馬力)
- 鋼板厚さ(最大):
- 2 mm
- 装備:
- 照明
オファーの詳細
- 広告ID:
- A19572531
- 更新:
- 最終更新日:15.01.2026
説明
* Air Preparation Unit:
The air preparation unit is a recirculation system that supplies the cabin with filtered fresh air and exhausts used air during the painting process. It heats the air to 60 °C, mixes the used air with 10% fresh air via an automatic multi-damper system, and reheats the air before routing it back into the cabin. The air is heated using a burner and a heat exchanger, both made of high-quality 304 stainless steel and housed within the fresh air unit. During painting, the air is filtered twice (via front and ceiling filters) before it enters the cabin. The contaminated air is also filtered twice (through inlet and outlet filters) before it exits via the exhaust unit. Air preparation units are insulated like the side walls to minimize heat loss and are protected against potential vibration and noise thanks to rubber seals on the covers. The exhaust air is regulated by a damper in the outlet duct, which helps control the internal pressure of the cabin.
* PRINCIPLES OF CABIN OPERATION:
The processes in the cabin are controlled via a control panel that manages the following steps:
* PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled by the extraction unit. Floor filters (paint stops) capture paint particles, and the air passes through the final exhaust filters before being discharged.
* FLASH-OFF PROCESS:
After painting, the cabin operates for approximately 15 more minutes to purge residual solvents and thinners. During this phase, fresh air from outside continues to circulate in the cabin.
* DRYING PROCESS:
In this phase, 80% of the air passing through the cabin is heated to 60 °C and supplied to the cabin via a distributor. As 20% of the solvent is released during drying, these solvents are expelled with the exhaust air. Industrial coatings are typically dried at 60 °C, but the cabin temperature can be adjusted via the control panel as required.
Bljdpfx Ahowzl Hxe Tjc
* COOLING PROCESS:
After the 30-minute drying process, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the 5-minute cooling phase, fresh air from outside circulates in the cabin, after which the system stops automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT:
These control panels manage the functions and operation of all machinery and devices inside the cabin. The control panel is constructed from durable galvanized sheet metal and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical devices and control panels:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control lines between the panel and motors or other electrical devices.
• Electrical wiring is designed to allow for cabin relocation if necessary.
• Operating devices use 380 V 50 Hz, while control devices use 220 V.
この広告は自動翻訳されています。翻訳ミスがある可能性があります。
The air preparation unit is a recirculation system that supplies the cabin with filtered fresh air and exhausts used air during the painting process. It heats the air to 60 °C, mixes the used air with 10% fresh air via an automatic multi-damper system, and reheats the air before routing it back into the cabin. The air is heated using a burner and a heat exchanger, both made of high-quality 304 stainless steel and housed within the fresh air unit. During painting, the air is filtered twice (via front and ceiling filters) before it enters the cabin. The contaminated air is also filtered twice (through inlet and outlet filters) before it exits via the exhaust unit. Air preparation units are insulated like the side walls to minimize heat loss and are protected against potential vibration and noise thanks to rubber seals on the covers. The exhaust air is regulated by a damper in the outlet duct, which helps control the internal pressure of the cabin.
* PRINCIPLES OF CABIN OPERATION:
The processes in the cabin are controlled via a control panel that manages the following steps:
* PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled by the extraction unit. Floor filters (paint stops) capture paint particles, and the air passes through the final exhaust filters before being discharged.
* FLASH-OFF PROCESS:
After painting, the cabin operates for approximately 15 more minutes to purge residual solvents and thinners. During this phase, fresh air from outside continues to circulate in the cabin.
* DRYING PROCESS:
In this phase, 80% of the air passing through the cabin is heated to 60 °C and supplied to the cabin via a distributor. As 20% of the solvent is released during drying, these solvents are expelled with the exhaust air. Industrial coatings are typically dried at 60 °C, but the cabin temperature can be adjusted via the control panel as required.
Bljdpfx Ahowzl Hxe Tjc
* COOLING PROCESS:
After the 30-minute drying process, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the 5-minute cooling phase, fresh air from outside circulates in the cabin, after which the system stops automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT:
These control panels manage the functions and operation of all machinery and devices inside the cabin. The control panel is constructed from durable galvanized sheet metal and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical devices and control panels:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control lines between the panel and motors or other electrical devices.
• Electrical wiring is designed to allow for cabin relocation if necessary.
• Operating devices use 380 V 50 Hz, while control devices use 220 V.
この広告は自動翻訳されています。翻訳ミスがある可能性があります。
お問い合わせを送信
これらの広告もご興味があるかもしれません。
小型広告
Gemmingen
9,298 km
板バリ取り機 / バリ取り機
NS MaquinasDM 1100 C
NS MaquinasDM 1100 C
小型広告
Rheinbach
9,259 km
乾式スプレー壁 吹き付け壁 塗り壁
D&MTSWc 3x2 10.800 m³/h
D&MTSWc 3x2 10.800 m³/h
小型広告
Bergeijk
9,266 km
Q-Finバリ取り・仕上げ機 SER600
Q-Fin Quality Finishing MachinesQ-Fin SER600 - MAG TS
Q-Fin Quality Finishing MachinesQ-Fin SER600 - MAG TS
小型広告
Luckenwalde
8,859 km
ステップバイステップの湿式塗装システム
PROTONSTP-STP
PROTONSTP-STP
小型広告
Toruń
8,527 km
アンダーベース付き塗装ブース 12x5x5 m
ABC-Group
ABC-Group
小型広告
Büyükkayacık OSB
8,787 km
ローローダ
GVN Trailer3 Axle Hydraulic Platform Lowbed
GVN Trailer3 Axle Hydraulic Platform Lowbed
小型広告
Nettetal
9,231 km
パウダーオーブン
KM IndustrieserviceElektro Kammerofen KM Pro
KM IndustrieserviceElektro Kammerofen KM Pro
小型広告
Parma
9,605 km
ローローダ建設機械
CEYLAN carrellone rampe idrauliche nuovo
CEYLAN carrellone rampe idrauliche nuovo
小型広告
Büyükkayacık OSB
8,787 km
ローローダ
GVN Trailer3 Axle Tramex Platform Lowbed
GVN Trailer3 Axle Tramex Platform Lowbed
小型広告
Möttingen
9,253 km
工業用粉体塗装工場
SAPI GmbH PulverbeschichtungsanlageKomplettsystem für industrielle
SAPI GmbH PulverbeschichtungsanlageKomplettsystem für industrielle
あなたの掲載は正常に削除されました
エラーが発生しました