ペイントショップPony Luxury Coating M&K
Pony 7000
ペイントショップ
Pony Luxury Coating M&K
Pony 7000
固定価格 消費税別
€42,450
製造年
2025
状態
新しい
所在地
Würzburg 

写真は示しています
地図を表示
機械に関するデータ
価格と所在地
固定価格 消費税別
€42,450
- 所在地:
- Schulstr 3, 97084 Würzburg, Deutschland

電話する
技術詳細
- 全高:
- 4,000 mm
- 全長:
- 7,000 mm
- 全幅:
- 3,000 mm
- 保証期間:
- 24 ヶ月
- 温度:
- 80 °C
- 空気需要:
- 36,000 m³/時
- 入力電圧:
- 380 V
- 暖房能力:
- 345 キロワット (469.07 馬力)
- 出力:
- 40 キロワット (54.38 馬力)
- 燃料:
- 液化石油ガス(LPG)
- エネルギー消費量:
- 40 キロワット時
- 断熱材:
- Mineralwolle
- 断熱材厚さ:
- 50 mm
- 定格出力:
- 345 キロワット (469.07 馬力)
- 装備:
- 照明
オファーの詳細
- 広告ID:
- A19572801
- リファレンス番号:
- L7000
- 更新:
- 最終更新日:15.01.2026
説明
MAIN STANDARD
Our paint booths are designed to meet all necessary requirements for paint application, including air filtration, extraction, lighting, and a controlled environment. Booth processes are managed via a PLC system, ensuring that desired values are maintained consistently.
OPERATING PRINCIPLES OF THE BOOTH
The booth’s processes are managed through a control panel, which oversees the following steps:
PAINTING PROCESS
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled through the extraction unit. Floor filters (paint stop filters) collect paint particles, and the air passes through final exhaust filters before being discharged.
FLASH-OFF PROCESS
After painting, the booth continues operating for approximately 15 minutes to purge residual solvents and thinners. During this phase, fresh air circulates from outside into the booth.
DRYING PROCESS
In this stage, 80% of the air passing through the booth is heated to 60°C and introduced via a distribution system. Since 20% of the solvent is released during drying, it is expelled with the exhaust air. Industrial coatings are typically dried at 60°C, but the booth temperature can be adjusted as needed via the control panel.
COOLING PROCESS
After the 30-minute drying cycle, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the subsequent 5-minute cooling phase, fresh air from outside circulates through the booth, after which the system shuts down automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT
These control panels govern the functions and operation of machines and devices housed within the booth. The panel is made of durable galvanized sheet and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical Equipment and Control Panel:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control connections between the control panel and motors or other electrical devices.
• Electrical wiring is designed to accommodate booth relocation if needed.
• Operating equipment uses 380 V 50 Hz, while control devices operate at 220 V.
• The booth’s operation time can be monitored on the electronic control panel, enabling straightforward maintenance scheduling.
• Temperature and time settings for booth ventilation (solvent flash-off), intermediate drying, and final drying can be easily adjusted to required values on the digital display of the electronic control panel.
• Users can monitor and adjust the drying time using the heating thermostat and time relay.
Gisdpfjwzmcbjx Abkor
この広告は自動翻訳されています。翻訳ミスがある可能性があります。
Our paint booths are designed to meet all necessary requirements for paint application, including air filtration, extraction, lighting, and a controlled environment. Booth processes are managed via a PLC system, ensuring that desired values are maintained consistently.
OPERATING PRINCIPLES OF THE BOOTH
The booth’s processes are managed through a control panel, which oversees the following steps:
PAINTING PROCESS
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled through the extraction unit. Floor filters (paint stop filters) collect paint particles, and the air passes through final exhaust filters before being discharged.
FLASH-OFF PROCESS
After painting, the booth continues operating for approximately 15 minutes to purge residual solvents and thinners. During this phase, fresh air circulates from outside into the booth.
DRYING PROCESS
In this stage, 80% of the air passing through the booth is heated to 60°C and introduced via a distribution system. Since 20% of the solvent is released during drying, it is expelled with the exhaust air. Industrial coatings are typically dried at 60°C, but the booth temperature can be adjusted as needed via the control panel.
COOLING PROCESS
After the 30-minute drying cycle, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the subsequent 5-minute cooling phase, fresh air from outside circulates through the booth, after which the system shuts down automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT
These control panels govern the functions and operation of machines and devices housed within the booth. The panel is made of durable galvanized sheet and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical Equipment and Control Panel:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
• Heat-resistant cables are used for command and control connections between the control panel and motors or other electrical devices.
• Electrical wiring is designed to accommodate booth relocation if needed.
• Operating equipment uses 380 V 50 Hz, while control devices operate at 220 V.
• The booth’s operation time can be monitored on the electronic control panel, enabling straightforward maintenance scheduling.
• Temperature and time settings for booth ventilation (solvent flash-off), intermediate drying, and final drying can be easily adjusted to required values on the digital display of the electronic control panel.
• Users can monitor and adjust the drying time using the heating thermostat and time relay.
Gisdpfjwzmcbjx Abkor
この広告は自動翻訳されています。翻訳ミスがある可能性があります。
提供者
注意: 無料で登録するかログインして、すべての情報を取得してください。
登録日: 2025
10 オンライン広告
お問い合わせを送信
電話 & ファックス
+49 176 7... 広告
これらの広告もご興味があるかもしれません。
小型広告
Würzburg
9,204 km
ペイントショップ
Pony Luxury Coating M&KPony 7000
Pony Luxury Coating M&KPony 7000
小型広告
Szentendre
8,917 km
木質バイオマス発電機 Mawera FU300R 350kW
MaweraFU300 R Aktionspreis! Big sale!
MaweraFU300 R Aktionspreis! Big sale!
小型広告
Schorfheide
8,772 km
ふるい/粉砕機
Sonstige/OtherGasparin Backenbrecher GI106C DIABLO
Sonstige/OtherGasparin Backenbrecher GI106C DIABLO
小型広告
ドイツ
9,058 km
バンドソー - 横型
BERG & SCHMIDGBS 305 HA-I Easy
BERG & SCHMIDGBS 305 HA-I Easy
小型広告
Corse Lawn
9,498 km
押出機
ReifenhäuserPET Extrusion Line
ReifenhäuserPET Extrusion Line
小型広告
Büyükkayacık OSB
8,787 km
ローローダ
GVN Trailer3 Axle Hydraulic Platform Lowbed
GVN Trailer3 Axle Hydraulic Platform Lowbed
小型広告
Schorfheide
8,772 km
ふるい/粉砕機
Sonstige/OtherGasparin Prallbrecher GI1010CV K1
Sonstige/OtherGasparin Prallbrecher GI1010CV K1
小型広告
Işıktepe OSB
8,878 km
ブレーキを押す
BaykalBAYKAL CNC APHS HYBRID PRESS BRAKE
BaykalBAYKAL CNC APHS HYBRID PRESS BRAKE
小型広告
Calcinato
9,547 km
板金加工センター
RASMultibend-Center 79.22-2
RASMultibend-Center 79.22-2
小型広告
Wasbek
8,834 km
汎用旋盤 - Servoturn 500/1000
KnuthServoturn 500/1000
KnuthServoturn 500/1000
あなたの掲載は正常に削除されました
エラーが発生しました





















































































