CHPプラント Capstone C1000 + APROVISCapstone
C1000
CHPプラント Capstone C1000 + APROVIS
Capstone
C1000
製造年
2015
状態
中古
所在地
Laško 

基本データ
価格と所在地
- 所在地:
- Laško, スロベニア

電話する
技術詳細
エンジンと変速機
燃料:
家庭用ガス H
出力詳細
入力電圧:
400 V
入力周波数:
50 ヘルツ
入力電流:
1,444 A
入力電流の種類:
三相
書類および認証
ドキュメント / マニュアル
冷却
冷却方式:
空気
詳細情報
定格(見かけ上)電力:
999 kVA(キロボルトアンペア)
最大回転速度:
60,000 回転/分
オファーの詳細
- 広告ID:
- A22903560
- リファレンス番号:
- SPTE-C1000
- 更新:
- 最終更新日:08.10.2026
説明
Used natural gas-fired combined heat and power plant for electricity and industrial steam production.
Main equipment:
• Capstone C1000: five C200 microturbine modules, each rated at 200 kW; electrical output of the complete package: 999 kWe; 400 V / 50 Hz; grid-parallel operation; common acoustic enclosure and control system.
• APROVIS waste heat steam boiler: rated production of 2,000 kg/h of saturated steam at 6 bar(g); maximum allowable pressure 9 bar(g); equipped with two economizer stages for heat recovery.
• Reinhard Simon CKO501G supplementary duct burner: 500 kW, for additional exhaust gas heating upstream of the boiler.
• BIO-KOMP fuel gas booster compressor: 30 kW, maximum flow 340 Nm³/h, discharge pressure 6 bar(g).
Dodpfxsz I T Eke Aa Ujku
The plant has been regularly maintained under a maintenance contract, with components replaced in accordance with the maintenance schedule. One of the five turbine modules is currently non-operational.
Operating hours: T1: 53,191 h; T2: 50,891 h; T3: 51,628 h; T4: 52,691 h; T5: 49,487 h.
The pressure equipment has an inspection certificate issued by an accredited pressure equipment inspection body. Technical documentation is available. Inspection, price and collection terms are subject to agreement.
この広告は自動翻訳されています。翻訳ミスがある可能性があります。
Main equipment:
• Capstone C1000: five C200 microturbine modules, each rated at 200 kW; electrical output of the complete package: 999 kWe; 400 V / 50 Hz; grid-parallel operation; common acoustic enclosure and control system.
• APROVIS waste heat steam boiler: rated production of 2,000 kg/h of saturated steam at 6 bar(g); maximum allowable pressure 9 bar(g); equipped with two economizer stages for heat recovery.
• Reinhard Simon CKO501G supplementary duct burner: 500 kW, for additional exhaust gas heating upstream of the boiler.
• BIO-KOMP fuel gas booster compressor: 30 kW, maximum flow 340 Nm³/h, discharge pressure 6 bar(g).
Dodpfxsz I T Eke Aa Ujku
The plant has been regularly maintained under a maintenance contract, with components replaced in accordance with the maintenance schedule. One of the five turbine modules is currently non-operational.
Operating hours: T1: 53,191 h; T2: 50,891 h; T3: 51,628 h; T4: 52,691 h; T5: 49,487 h.
The pressure equipment has an inspection certificate issued by an accredited pressure equipment inspection body. Technical documentation is available. Inspection, price and collection terms are subject to agreement.
この広告は自動翻訳されています。翻訳ミスがある可能性があります。
提供者
注意: 無料で登録するかログインして、すべての情報を取得してください。
最終オンライン:先週
登録日: 2025
2 オンライン広告
お問い合わせを送信
電話 & ファックス
+386 51 2... 広告
あなたの掲載は正常に削除されました
エラーが発生しました
















