精密制御付き混合プラントMischanlage elktronisch gesteuert
精密制御付き混合プラント
Mischanlage elktronisch gesteuert
VB 消費税別
€38,500
製造年
2023
状態
中古
所在地
Havelsee 

基本データ
価格と所在地
VB 消費税別
€38,500
- 所在地:
- Havelsee, ドイツ

電話する
技術詳細
給紙トレイの数:
2
オファーの詳細
- 広告ID:
- A22368807
- 更新:
- 最終更新日:21.07.2026
説明
Scope of supply of the system
The offer includes:
1. Mixer
• Concrete mixer with a capacity of 9 m³.
• Mixer screw inside the mixer has been renewed and reinforced.
• The mixer is driven by a powerful electric motor.
• The mixer is mounted on four load cells (each with a load capacity of 20 t) for precise weighing of the materials to be mixed.
2. Trough screw conveyor 1
• Conveying system for feeding the mixer.
Pgedpfx Ahszmyvie Eeu
3. Trough screw conveyor 2
• Conveying system for discharging the finished mixed material.
4. Liquid feed
• Dosing of liquid components via a pumping system from Flux.
5. Electronic control
• Electronic control with a mobile operating unit for weighing and dosing based on the weight increase of the material in the mixer.
Mode of operation
• The mixer is installed on load cells. The current material weight is displayed on the display at all times.
• For example, if a total mixture of 4,500 kg is to be produced, this can be dosed precisely according to a predefined mixing ratio, e.g. 80% main material (3,600 kg), 10% additive (450 kg), 7% additive (315 kg) and 3% additive (135 kg).
• The smaller additives are pre-weighed and fed into trough screw conveyor 1 via the additive hopper using a travelling carriage from big bags.
• Subsequently, the main material is conveyed into the mixer via trough screw conveyor 1 until the desired total weight of 4,500 kg is reached.
• After that, the feed is stopped via the trough screw conveyor.
• The mixing process then takes place according to the requirements. In our application, the mixing time was approximately 20 minutes.
• After the mixing process is complete, the material is discharged via trough screw conveyor 2. To do this, the direction of rotation of the drive motor is switched at the control panel and the discharge screw conveyor is switched on.
• The finished mixture can then be filled directly into containers or loaded into transport vehicles (in our case, a push-off trailer or manure spreader).
Mixing process based on weight percentages
1. The main material is fed into the trough screw conveyor via the large stainless steel hopper, which then conveys the material into the mixer. In our case, this consisted of solid components from biogas waste.
2. Additional components can be added directly from big bags onto the main material using a second stainless steel hopper and a traverse. This ensures pre-mixing during the conveying process. In our application, biochar and bentonite were added.
3. Liquid components are sprayed directly into the mixer. In our case, we used EMa (activated effective microorganisms) for this purpose.
Optionally, the push-off trailer/manure spreader can be purchased.
この広告は自動翻訳されています。翻訳ミスがある可能性があります。
The offer includes:
1. Mixer
• Concrete mixer with a capacity of 9 m³.
• Mixer screw inside the mixer has been renewed and reinforced.
• The mixer is driven by a powerful electric motor.
• The mixer is mounted on four load cells (each with a load capacity of 20 t) for precise weighing of the materials to be mixed.
2. Trough screw conveyor 1
• Conveying system for feeding the mixer.
Pgedpfx Ahszmyvie Eeu
3. Trough screw conveyor 2
• Conveying system for discharging the finished mixed material.
4. Liquid feed
• Dosing of liquid components via a pumping system from Flux.
5. Electronic control
• Electronic control with a mobile operating unit for weighing and dosing based on the weight increase of the material in the mixer.
Mode of operation
• The mixer is installed on load cells. The current material weight is displayed on the display at all times.
• For example, if a total mixture of 4,500 kg is to be produced, this can be dosed precisely according to a predefined mixing ratio, e.g. 80% main material (3,600 kg), 10% additive (450 kg), 7% additive (315 kg) and 3% additive (135 kg).
• The smaller additives are pre-weighed and fed into trough screw conveyor 1 via the additive hopper using a travelling carriage from big bags.
• Subsequently, the main material is conveyed into the mixer via trough screw conveyor 1 until the desired total weight of 4,500 kg is reached.
• After that, the feed is stopped via the trough screw conveyor.
• The mixing process then takes place according to the requirements. In our application, the mixing time was approximately 20 minutes.
• After the mixing process is complete, the material is discharged via trough screw conveyor 2. To do this, the direction of rotation of the drive motor is switched at the control panel and the discharge screw conveyor is switched on.
• The finished mixture can then be filled directly into containers or loaded into transport vehicles (in our case, a push-off trailer or manure spreader).
Mixing process based on weight percentages
1. The main material is fed into the trough screw conveyor via the large stainless steel hopper, which then conveys the material into the mixer. In our case, this consisted of solid components from biogas waste.
2. Additional components can be added directly from big bags onto the main material using a second stainless steel hopper and a traverse. This ensures pre-mixing during the conveying process. In our application, biochar and bentonite were added.
3. Liquid components are sprayed directly into the mixer. In our case, we used EMa (activated effective microorganisms) for this purpose.
Optionally, the push-off trailer/manure spreader can be purchased.
この広告は自動翻訳されています。翻訳ミスがある可能性があります。
提供者
注意: 無料で登録するかログインして、すべての情報を取得してください。
登録日: 2021
1 オンライン広告
お問い合わせを送信
電話 & ファックス
+49 8191 ... 広告
これらの広告もご興味があるかもしれません。
成功
あなたのメッセージが送信されました。
小型広告
アイルランド
9,582 km
パレット反転機 / パレットターンナー
Premier Pallet InverterFS1900
Premier Pallet InverterFS1900
成功
あなたのメッセージが送信されました。
小型広告
Wartenberg
9,222 km
2分割スタースクリーン
Anlagenbau GüntherMULTISTAR ONE / MS ONE
Anlagenbau GüntherMULTISTAR ONE / MS ONE
成功
あなたのメッセージが送信されました。
小型広告
Berlin
8,819 km
ツインスクリューホッパー
成功
あなたのメッセージが送信されました。
小型広告
Gmunden
9,170 km
アタッチメント風ふるい
TUKWINDPRO 18
TUKWINDPRO 18
成功
あなたのメッセージが送信されました。
小型広告
Sinsheim
9,294 km
プラウシェア・ミキサー使用
MAPWBHP 15000
MAPWBHP 15000
成功
あなたのメッセージが送信されました。
小型広告
Bad Langensalza
9,054 km
ヤードローダー
ManitouMLA 2-25 H
ManitouMLA 2-25 H
成功
あなたのメッセージが送信されました。
小型広告
Oberleichtersbach
9,164 km
スクリーニングプラント
Metso2PP 7000/2250
Metso2PP 7000/2250
成功
あなたのメッセージが送信されました。
小型広告
Bad Salzungen
9,099 km
スターシーブESS
Butzer - EVRESS
Butzer - EVRESS
成功
あなたのメッセージが送信されました。
小型広告
Polków-Sagały
8,417 km
パレットチェンジャースイベル
PREMIERV CHANGER
PREMIERV CHANGER
成功
あなたのメッセージが送信されました。
小型広告
Dinkelscherben
9,295 km
リフティングマグネット マグネットブロック 永久磁石 Fe
die magnetprofisPEM2000x850x200
die magnetprofisPEM2000x850x200
あなたの掲載は正常に削除されました
エラーが発生しました















































































