ロボット組立ステーション、ドージングステーションEpson
G10-854SR
ロボット組立ステーション、ドージングステーション
Epson
G10-854SR
VB 消費税別
€7,140
状態
中古
所在地
Borken 

写真は示しています
地図を表示
機械に関するデータ
価格と所在地
VB 消費税別
€7,140
- 所在地:
- Dunkerstrasse 29, 46325 Borken/Burlo, Deutschland

電話する
オファーの詳細
- 広告ID:
- A7393211
- リファレンス番号:
- 25070
- 更新:
- 最終更新日:07.08.2025
説明
Epson G10-854SR Robot Assembly Station Dispensing Station
The assembly station is divided into the following sub-stations: 3.1 Dispensing Area, 3.2 Assembly Area KK+SW, and 3.3 Assembly Area Front. (KK = heatsink, SW = front wall bracket)
St.3.1: Dispensing Area
- A workpiece carrier (WT) with mounted chassis and circuit boards is conveyed via the transfer belt into the dispensing area.
- The WT is stopped at the lift-positioning unit (HuPo), raised off the belt, and secured in place
- The X-Y-Z handling system moves the dispensing head to the designated position and initiates the dispensing process.
- Once dosing is completed successfully, the handling system moves to the home position and the WT is placed back onto the conveyor
- Transfer continues into the assembly area KK+SW (prerequisite: no WT in placement position)
Cgsdpeibx S Nsfx Ac Aen
St.3.2: Assembly Area KK+SW
- A WT transported from the dispensing area enters the KK+SW assembly area via the transfer belt.
- It is stopped at the lift-positioning unit (HuPo), raised from the conveyor, and fixed in place; during this, the chassis side panels of the partially assembled component are aligned
- Simultaneously, the positioning of the KK and SW tray is carried out
- Both a KK tray stack (12) and a SW tray stack (12) are manually placed onto each respective infeed conveyor outside of the safety enclosure
- The two safety shutters are opened and the loaded tray stacks are conveyed into the gripping position of their respective stackers
- The safety shutters are then closed
- The respective grippers pick up the corresponding tray
- Using the Z-axis, trays are singled and transported upwards (above the actual pick-up height)
- To center and stabilize the trays, a centering support is positioned beneath each tray using the X-handling system.
- Using the stacker Z-axis, each tray is placed onto its centering support
- The trays are now ready for component pick-up
- The SCARA robot with a multi-gripper picks up the KK from the tray and places it in an intermediate alignment position (to compensate for inaccuracies in the pick-up and establish a fixed gripping point for assembly)
- The KK is scanned, picked up again, and if the scanner result is OK, installed onto the WT
- Non-OK KKs are placed in a non-OK container
- The multi-gripper on the SCARA robot then picks up the SW from the tray and places it in the alignment position
- The SW is picked up again and installed onto the WT
- Continue with Assembly Area Front
Technical Data
Design: SCARA (4-axis robot)
Payload: nominal 5 kg, maximum 10 kg
Horizontal reach: 850 mm
Vertical reach: Axis 3: 420 mm
Rotational range: J4: +/- 360°
Horizontal repeatability: +/- 0.025 mm
Vertical repeatability: J3: +/- 0.01 mm
Rotational repeatability: J4: +/- 0.005°
Maximum work envelope: Axis 1: +/- 152°, Axis 2: +/- 152.5°, Axis 3: 420 mm, Axis 4: +/- 360°
Maximum operating speed: J1,J2: +/- 11,000 mm/s, J3: +/- 2,350 mm/s, J4: +/- 2,400°/s
Permissible inertia: nominal 0.02 kg*m², maximum 0.25 kg*m²
User cabling, electrical: 1x D-Sub 9 pin, 1x D-Sub 15 pin
Z-axis: Outer diameter: 25 mm
Press-in force: 250 N
Weight: 48 kg
Control: EPSON RC180
Mounting type: Ceiling
IP protection class: IP20
Power and signal cables: 3 m
Additional assembly modules in other sizes – new and used – can be found in our shop!
International shipping costs on request.
この広告は自動翻訳されています。翻訳ミスがある可能性があります。
The assembly station is divided into the following sub-stations: 3.1 Dispensing Area, 3.2 Assembly Area KK+SW, and 3.3 Assembly Area Front. (KK = heatsink, SW = front wall bracket)
St.3.1: Dispensing Area
- A workpiece carrier (WT) with mounted chassis and circuit boards is conveyed via the transfer belt into the dispensing area.
- The WT is stopped at the lift-positioning unit (HuPo), raised off the belt, and secured in place
- The X-Y-Z handling system moves the dispensing head to the designated position and initiates the dispensing process.
- Once dosing is completed successfully, the handling system moves to the home position and the WT is placed back onto the conveyor
- Transfer continues into the assembly area KK+SW (prerequisite: no WT in placement position)
Cgsdpeibx S Nsfx Ac Aen
St.3.2: Assembly Area KK+SW
- A WT transported from the dispensing area enters the KK+SW assembly area via the transfer belt.
- It is stopped at the lift-positioning unit (HuPo), raised from the conveyor, and fixed in place; during this, the chassis side panels of the partially assembled component are aligned
- Simultaneously, the positioning of the KK and SW tray is carried out
- Both a KK tray stack (12) and a SW tray stack (12) are manually placed onto each respective infeed conveyor outside of the safety enclosure
- The two safety shutters are opened and the loaded tray stacks are conveyed into the gripping position of their respective stackers
- The safety shutters are then closed
- The respective grippers pick up the corresponding tray
- Using the Z-axis, trays are singled and transported upwards (above the actual pick-up height)
- To center and stabilize the trays, a centering support is positioned beneath each tray using the X-handling system.
- Using the stacker Z-axis, each tray is placed onto its centering support
- The trays are now ready for component pick-up
- The SCARA robot with a multi-gripper picks up the KK from the tray and places it in an intermediate alignment position (to compensate for inaccuracies in the pick-up and establish a fixed gripping point for assembly)
- The KK is scanned, picked up again, and if the scanner result is OK, installed onto the WT
- Non-OK KKs are placed in a non-OK container
- The multi-gripper on the SCARA robot then picks up the SW from the tray and places it in the alignment position
- The SW is picked up again and installed onto the WT
- Continue with Assembly Area Front
Technical Data
Design: SCARA (4-axis robot)
Payload: nominal 5 kg, maximum 10 kg
Horizontal reach: 850 mm
Vertical reach: Axis 3: 420 mm
Rotational range: J4: +/- 360°
Horizontal repeatability: +/- 0.025 mm
Vertical repeatability: J3: +/- 0.01 mm
Rotational repeatability: J4: +/- 0.005°
Maximum work envelope: Axis 1: +/- 152°, Axis 2: +/- 152.5°, Axis 3: 420 mm, Axis 4: +/- 360°
Maximum operating speed: J1,J2: +/- 11,000 mm/s, J3: +/- 2,350 mm/s, J4: +/- 2,400°/s
Permissible inertia: nominal 0.02 kg*m², maximum 0.25 kg*m²
User cabling, electrical: 1x D-Sub 9 pin, 1x D-Sub 15 pin
Z-axis: Outer diameter: 25 mm
Press-in force: 250 N
Weight: 48 kg
Control: EPSON RC180
Mounting type: Ceiling
IP protection class: IP20
Power and signal cables: 3 m
Additional assembly modules in other sizes – new and used – can be found in our shop!
International shipping costs on request.
この広告は自動翻訳されています。翻訳ミスがある可能性があります。
これらの広告もご興味があるかもしれません。
小型広告
Altena
9,173 km
チャンバーフィルタープレス用フィルタークロス
Filtertücher für FilterpressenKurzfristig verfügbar
Filtertücher für FilterpressenKurzfristig verfügbar
小型広告
Berlin
8,819 km
産業用ロボット
KukaKR 90
KukaKR 90
小型広告
Dinkelscherben
9,295 km
コンベアベルト 射出成形 L コンベアベルト
die magnetprofis2022120610
die magnetprofis2022120610
小型広告
Gers
10,178 km
ファイバーレーザー切断機
Bodor P3 20KW
Bodor P3 20KW
小型広告
Coevorden
9,090 km
レーザー切断機 2パレット 6 Kw
OREEOR-PH 3015 STOCK ( 6 KW )
OREEOR-PH 3015 STOCK ( 6 KW )
小型広告
Deining
9,172 km
ガスバーナー
WEISHAUPT WM-G10/4-A // 1100kw,WM -G10/3-A /// 1000kw
WEISHAUPT WM-G10/4-A // 1100kw,WM -G10/3-A /// 1000kw
小型広告
ドイツ
9,058 km
フルプロテクションレーザー切断機
BodorP Series 22KW
BodorP Series 22KW
小型広告
Roreto
9,744 km
両面給電ステーション
MAHROS (SCM Group)BRUSH / D - C
MAHROS (SCM Group)BRUSH / D - C
小型広告
Milan
9,607 km
エコノミカルなファイバーレーザー切断機
Bodor C
Bodor C
小型広告
Großrudestedt
9,035 km
ファイバーレーザー、ファイバーレーザー、レーザーマシン
YAWEIHLF1530 8KW
YAWEIHLF1530 8KW
あなたの掲載は正常に削除されました
エラーが発生しました
















































































